Pamesa and Sugranes upgrade their plants
Pamesa, a leading ceramic group with investments additionally in Brazil, will be supplied with a body preparation plant equipped with latest-generation batching systems. The plant will initially have an output of 9,500 sq.m/day of single-fired tiles in 330x330 mm and 450x450 mm sizes and will comprise two BM 38000 discontinuous mills and a spray dryer with 18,000 litre capacity. The supply contract will also include a 93 metre glazing line and a complete storage line for unfired product to feed the kiln.
Also in Spain, the new plant supplied by Barbieri & Tarozzi to Sugranes is currently starting up production. This new line is capable of producing extruded products in 330x310x40 mm, 330x330x50 mm and 120x240x9 mm sizes with a daily production of 650 sq.m.
Significantly, with this plant Sugranes will be able to produce large-thickness trim pieces, particularly steps and special tiles for swimming pools.
The supply contract includes the installation of a new single-layer kiln of length 53.28 metres served by a complete line of latest-generation storage machines for box and kiln loading and unloading.
Did you find this article useful?
Join the CWW community to receive the most important news from the global ceramic industry every two weeks
Recent articles
Foshan Uniceramics Expo 2025
Nov 22, 2024
Ceramic World Review Persian 64/2024
Nov 21, 2024
Kerakoll and LB collaborate in India
Nov 21, 2024
FRITTA: FIND YOUR ESSENCE
Nov 15, 2024
Lamosa orders a second I-Nkfiller® system
Nov 15, 2024