RAK Ceramics adopts LB technology for reusing production waste
LB is implementing a new body preparation plant at RAK Ceramics' facility in Ras Al Khaimah, UAE.
A new complete body preparation plant covering all stages from raw material reception to press loading is being built at the RAK Ceramics Group’s facility at Ras Al Khaimah (UAE).
The project was commissioned to LB, which studied the line in meticulous detail in order to meet the ceramic manufacturer’s requirements. In order to optimise costs, Rak Ceramics aims to reuse all production waste through a “closed circuit” recycling process. The most suitable solution was judged to be the proposal from LB, which has always been attentive to issues of savings, reuse and recycling.
Did you find this article useful?
Join the CWW community to receive the most important news from the global ceramic industry every two weeks