On lease since July 2021, the Sassuolo-based company has now been fully incorporated into Green Tech Engineering, part of the Minerali Industriali group, thereby consolidating its offering in the field of raw material processing equipment.
Commissioned in March this year, the new Kerakoll factory in Brazil is located in Jundiai (São Paulo) and has a production capacity of around 40,000 tonnes/year.
Autin is due to supply plants for the production of ready-mixed products for the Mapei facility in Hungary and for the first Xella production site in Italy.
Visitors from countries all over the world at the LB stand at Tecnargilla. Emilio Benedetti guides us to the discovery of the exclusive ceramic projects realized in double loading or full-body with a passing-through vein and of the new augmented reality applications developed in collaboration with AST4.
The Egyptian group Aracemco has increased the production capacity of its raw materials preparation department with the installation of a Molomax 6/230 pendular mill from Manfredini & Schianchi.
The event was organized by the Ceramic Industry Club of the Federation of Thai Industries, and the theme was "Energy saving and product improvement with new technologies".